Golden autumn trees beside a river below snow-dusted mountains.

Costs & planning

ADU project
costs.

Plan for the home and the work your property needs. Explore price ranges, check what is included, then build a planning budget.

Open Budget CreatorNo email required. Save or download your budget.

What should you budget?

Published planning ranges in CAD.
Sea-to-Sky & North Vancouver.

Single-storey ADUs

Studio
$240,000–$320,000
1 bedroom
$280,000–$430,000
2 bedrooms
$400,000–$600,000+

Carriage houses & two-storey ADUs

1 bedroom + garage
$425,000–$550,000
2 bedrooms + garage
$550,000–$800,000+
Small 2-bedroom, no garage
$540,000–$800,000+

What these ranges cover

These planning ranges include design, permits, foundations, utilities, finishes and appliances. Confirm GST, contingency and unusual site work with us before using a range as your total budget.

Using the calculator

The Budget Creator adds reserve and GST to the selected work. Compare what each figure includes; the published ranges are separate examples, not amounts to add to your calculator total.

A 600 sq. ft. calculator example

The default uses an upgraded modular home and allowances for an unconfirmed site. It includes a sewer lift station, stormwater work and two modules transported from Vancouver Island. Change these choices when you know your property and supplier route.

Home allowance
$240,000
Other selected project work
$241,500
Reserve · 10%
$48,150
GST allowance
$26,483
Fees & legal
$10,000
Planning budget · CAD
$566,133

Figures rounded; total calculated before rounding. This is one calculator scenario; the bedroom-based ranges above use different designs and scopes.

Adjust this example in Budget Creator ↗
Valleycliffe backyard during foundation and service preparation.

The work around the home

Site work &
project costs.

Access, ground conditions and utility connections can change the scope before construction starts.

What can move the price?

Ground & flood conditions

Soil, groundwater and the required floor elevation shape the foundation, excavation and entrance stairs. Confirm these before choosing a building or fixing the budget.

Services & access

Long service runs, power upgrades, pumping and restricted crane access can add work. Check connection routes and delivery access early.

Additional work

Allow for demolition, environmental reviews and the outdoor work needed to finish the property. Streamside protection can affect the layout and service routes.

See the Valleycliffe project

Budget Creator

Build your
planning budget.

Choose a home, adjust site allowances and see the breakdown. Keep a draft in your browser or download a PDF to discuss with your project team.

Create my budget
Completed Valleycliffe ADU, a project example rather than a priced package.Explore your own budget ↗

Valleycliffe project example. The published ranges are not a price for this home.

Already have a quote?

Mark what’s included, then save your follow-up questions.

0 / 8items reviewed
0 included0 allowances8 to confirm

Structure, interior, appliances and the work remaining at handover.

Survey, reports, design, engineering and construction reviews.

Applicable fees, utility charges, registrations and deposits.

Excavation, the full support system, drainage and restoration.

Service routes, connections and any utility or street work.

Transport, crane, staging, placement and final connections.

Demolition, stairs, decks, parking, fencing and landscaping.

Tax, owner-paid work, financing and a contingency for unknowns.

8 items need confirming.

Confirm the drawings, exclusions and taxes in writing with your builder.

Your follow-up questions (8)
  1. Building & finishes

    Which drawings and finishes does the quote use? What remains to be completed?

  2. Design & consultants

    Are investigations, revisions, site visits and final documents included?

  3. Permits & charges

    Which charges have been checked for this project? Are any deposits refundable?

  4. Site & foundations

    What ground conditions are assumed? Is the complete engineered support system included?

  5. Water, sewer, storm & power

    Are the routes, levels, pipe condition and capacity confirmed? Who handles upgrades?

  6. Delivery & installation

    Who pays for route work, crane setup, placement and connection work afterward?

  7. Removal & outdoor work

    Are assessments, disposal and restoration included? What will the finished yard include?

  8. Taxes, owner costs & reserve

    Is tax included? What is paid directly by the owner, and what uncertainty does the reserve cover?

Optional. Stored in this browser only; not sent to NewlinesADU.

This checks scope, not the accuracy of a price.

Read the full project budget guide

Have a property in mind?

A remote lot review looks at building options, access and services before you choose a home.