Pre-Construction Planning
Before you spend hundreds of thousands, spend $3,500 to remove the unknowns — so you can make confident decisions.
10–15 business days • Trade response dependent • 100% credited to build
The problem we solve
After a site visit, most people get stuck in indecision. This phase turns stress into a plan.
Less guessing
Fewer surprises
We flag the big cost movers early: access, servicing, foundation, and constraints.
Clear direction
One path forward
We recommend a direction and a simple finish level so you can decide without second-guessing.
A confident next step
Roadmap, not guesswork
You leave with a clear path into design/engineering/permit work — only if it’s worth pursuing.
What we heard
We document your priorities, then reflect the plan back to you.
Your goals
- Primary goal: family / rental / aging parent / resale
- Timeline goal: move-in window or “no rush”
- Budget comfort: tight / flexible / need options
Your worries → our response
- Top worries: permits / costs / disruption / neighbours / unknowns
- Non-negotiables: layout / parking / privacy / finishes
- How we’ll address them: plan + trade checks + clear scope boundaries
How it works
Three steps. Clear outputs.
-
Kickoff (Day 1)
Confirm goals, constraints, and decision criteria. We collect what we need to start.
-
Feasibility review + trade site visit (Days 2–12)
We tighten feasibility, logistics, and rough pricing ranges.
-
Pre-construction planning package + review call (Days 10–15)
You get the full package below, then we walk it together and align on next steps.
Deliverables
Everything you need to make a confident go/no-go decision.
| Deliverable | What you get | Why it matters |
|---|---|---|
| Client priorities recap | Goals + worries + budget comfort + how we’ll address them | Keeps decisions simple and aligned |
| Compliance report | GIS maps + zoning check; DPAs flagged | Finds feasibility “gotchas” early |
| Preliminary siting sketch | Discussion sketch to explore placement | Visual clarity before design spend |
| Model direction + spec level | Recommended direction | Avoids scope creep |
| Budget range | Range with allowances + key cost movers flagged | Confidence before committing |
| Trade/manufacturer consults | Logistics/utilities/manufacturer checks to tighten price ranges | Reduces surprises |
| Timeline | Realistic sequence from here to move-in | Sets expectations |
| Next-step roadmap | What’s needed for permit phase; optional add-ons | Clear path forward (or clear reason to pause) |
Client priorities recap
Goals + worries + budget comfort + how we’ll address them
Keeps decisions simple and aligned
Compliance report
Public maps + zoning basics; overlays flagged to confirm
Finds “gotchas” early
Preliminary siting sketch
Discussion sketch to explore placement
Visual clarity before design spend
Model direction + spec level
Recommended direction
Avoids scope creep
Budget range
Range with allowances + key cost movers flagged
Confidence before committing
Trade/manufacturer consults
Logistics/utilities/manufacturer slot checks to tighten ranges
Reduces surprises
Timeline
Realistic sequence from here to move-in
Sets expectations
Next-step roadmap
What’s needed for permit phase; optional add-ons
Clear path forward (or clear reason to pause)
$3,500 + GST • 10–15 business days • 100% credited to build
This reduces stress
You’re supported. You’re not chasing people. You’re not guessing.
Single point of contact
One person accountable
We leads the phase end-to-end. Clear answers. Fast follow-through.
Weekly update
Transparency
What’s done, what’s next, and what we’re waiting on.
Simple decisions
1–2 recommendations
We bring options that matter. Not a list of maybes.
What this is not
Planning-grade only. No permit submission. No permit-ready drawings.
Not included
- Survey
- Engineering / structural design
- Energy modelling
- Permit-ready drawings / Letters of Assurance
- Permit submission or District approvals
- District fees
Also not included
- Utility locates
- Soils tests / geotech
- Arborist reports
- Legal/title review
- Construction work
Who it’s for
A step for homeowners who want clarity before committing.
Great fit if you…
- Want a realistic range before design + permits
- Need clarity on feasibility, siting, access, and servicing
- Want a calm, guided next step after the site visit
Not a fit if you…
- Only want permit drawings (this is earlier)
- Already have survey + engineered permit-ready plans
- Want to start construction without confirming scope/approvals
FAQs
Quick answers. Clear boundaries.
Why pay $3,500 for planning?
Is it credited if we build with you?
What if we don’t proceed with the build?
Will this get us a permit?
What do you need from us to start?
How accurate is the budget range?
How long does it take?
What’s next after PCPP?
Ready for clarity?
Pre-Construction Planning is $3,500 + GST. It takes 10–15 business days, and it’s 100% credited to the build if you move forward.
Low-stress next step after your site visit