Installed by NewlinesADU • North-Vancouver • Squamish • Whistler • Pemberton • Sea-to-Sky
Hewing Haus modular homes — installed by NewlinesADU.
High-quality, sustainable prefab homes with flexible floor plans, customization options, and on-/off-grid integrations — built indoors, then set fast on-site.
24–72h • Remote • No obligation
Looking for pricing context first? Read the ADU Cost Guide • Read the ADU Guide
Why Hewing Haus
Premium prefab, built with a purpose — and a process that keeps the project predictable.
Indoor prefabrication
A tried and true process
Built indoors to reduce weather delays, on-site disturbance, and material waste.
Sustainable materials
CLT + renewable forestry
Renewable materials from local, sustainably managed forests — including cross-laminated timber.
Customizable + expandable
Make it yours
Exterior + interior options, modular layouts, and integrations including on- and off-grid paths.
Certification
CSA A277
Hewing Haus homes are CSA A277 certified.
Timeline
Built in 4–6 weeks
Standard builds can be built in 4–6 weeks. Total project timelines are typically up to 6-8 months including permits, design, and site prep.
Models / options
A quick shortlist to start your feasibility conversation. We’ll confirm what fits your zoning, setbacks, and access.
Pricing below is “starting at” as listed on Hewing Haus model pages.
200 sq ft
Nootka 2
Starting at: $134,500
- Studio with kitchen/living
- Prefabricated, move-in ready
300 sq ft
Pender 3
Starting at: $186,500
- Separate bedroom, kitchen, living space
- Prefabricated, move-in ready
400 sq ft
Quadra 4
Starting at: CAD $224,000
- Separate kitchen, bedroom, living room
- Prefabricated, move-in ready
600 sq ft
Granville 6
Starting at: CAD $311,000
- 2 bedrooms + flex space
- Prefabricated, move-in ready
700 sq ft
Saturna 7
Starting at: $359,000
- 2 bedrooms, open living space
- Prefabricated, move-in ready
800 sq ft
Copper 8
Starting at: $405,000
- 2 bedrooms + large master ensuite
- Prefabricated, move-in ready
On-site prep (permitting, foundations, site services, shipping, install) is additional cost — we’ll map that scope during your lot assessment.
How the partnership works
Clear scope. Predictable handoffs. One local team managing the full path to a finished home.
Hewing Haus
Factory build + model options
- Prefabricated build (indoors)
- Standard plans + customization options
- Published model specs + “starting at” pricing (as listed)
NewlinesADU
Feasibility + permits + site + install
- Lot feasibility: zoning, setbacks, access, servicing routes
- Permit coordination + local requirements
- Foundation + utilities + crane planning + connections + inspections
- Handover + closeout documentation
Want cost context? Read the ADU Cost Guide
Cost + what’s included
Transparent scope first — then we price it properly for your lot.
Module (Hewing Haus)
Published “starting at” pricing
Hewing Haus lists starting prices on each model page. We’ll confirm current pricing and the right model size for your lot.
Site + install (NewlinesADU)
The full path from idea to occupancy
- Permitting support + coordination
- Foundation + site services
- Delivery planning + crane set
- Utility connections + inspections + handover
For all-in ranges, start here: ADU Cost Guide
Final cost depend on access, servicing distance, municipal requirements, foundation choice, and current Hewing Haus pricing.
Process
Short, steady steps — so you always know what’s next.
-
Free lot assessment
Zoning, setbacks, access, servicing route, and best-fit Hewing Haus model sizes.
-
Pre-construction planning
Foundation approach, utility scope, crane plan, and budget alignment.
-
Permits + approvals
Drawings, submissions, and revisions (as needed) to get to issuance.
-
Site work
Foundation + undergrounds + service prep to be ready for delivery day.
-
Delivery + set
Crane set + connections. Installation typically 1–2 days once the site is prepped.
-
Finish + handover
Inspections, final documentation, and move-in readiness.
FAQ
Quick answers — then we’ll confirm your exact lot details in the assessment.
How long does it take?
What does installation day look like?
Can I customize a Hewing Haus?
What does my site need?
Is a Hewing Haus allowed as an ADU / garden suite in Sea-to-Sky?
What’s included vs extra?
Want more detail direct from Hewing Haus: Homepage • Homes + floorplans • Benefits • FAQs
Ready to plan yours?
Start with a free lot assessment. We’ll confirm feasibility, outline next steps, and map realistic site + install costs for a Hewing Haus project.
24–72h • Remote • No obligation
